Digital Heritage Lab
- Proposed budget (Rs): 70,00,000
-
Estimated timeline:
1 Year
- Faculty Members: Dr. Rabi Narayan Mohanty (Lead), Dr. Kumar Abhishek, Dr. Nikhil Kumar, Dr. Nikhil Kumar, Dr. Atul Kumar
Tinkering & Prototyping lab
- Proposed budget (Rs): 4,20,000
-
Estimated timeline:
2-3 Months from the time of the receipt of the donation/grant
- Faculty Members: Dr. E. V. S. Kiran Kumar Donthu (Lead), Dr. Atul Kumar, Dr. Nikhil Kumar, Dr. Aditya P. Sanyal
Center for Research in Energy, Sustainability, and Technology (CREST)
- Proposed budget (Rs): 5,00,00,000
-
Estimated timeline:
5 Years
- Faculty Members: Prof. Hiralal Pramanik (Lead Role), Prof. Manoj Kumar Mondal, Dr. Manoj Kumar, Dr. Nitai Chandra Maji
Center for Research in Engineering Advanced Materials for Sustainability (CREAMS)
- Proposed budget (Rs): 8,00,00,000
-
Estimated timeline:
- Year 1: Develop infrastructure, procure equipment for material synthesis and testing, and recruit staff.
- Years 2-3: Conduct research on scalable material production and pilot-scale biofuel synthesis.
- Years 4-5: Establish testing facilities, collaborate with industries, and demonstrate industrial-scale production and applications.
- Faculty Members: Dr. Nitai Chandra Maji (Lead Role), Prof. Hiralal Pramanik, Dr. Ganesh B, Prof. M.K. Mondal
Multipurpose Annex-Tower For Faculty Sitting , Research space , Lecture hall and Seminar Hall
- Proposed budget (Rs): 30,00,00,000
-
Estimated timeline:
2 years
- Faculty Members: HOD (Lead Role) and Lab Faculty Incharge
Renovation and Naming of Process Control Laboratory
- Proposed budget (Rs): 2,00,00,000
-
Estimated timeline:
1 Year
- Faculty Members: HOD (Lead Role) and Lab Faculty Incharge
Renovation and Naming of Energy Resources Lab
- Proposed budget (Rs): 2,00,00,000
-
Estimated timeline:
1 Year
- Faculty Members: HOD (Lead Role) and Lab Faculty Incharge
Renovation and Naming right of Chemical Reaction Engineering Laboratory
- Proposed budget (Rs): 2,00,00,000
-
Estimated timeline:
1 Year
- Faculty Members: HOD (Lead Role) and Lab Faculty Incharge
Renovation and Naming right of Computational Lab
- Proposed budget (Rs): 4,00,00,000
-
Estimated timeline:
1 Year
- Faculty Members: HOD (Lead Role) and Lab Faculty Incharge
Naming Right of Mass Transfer
- Proposed budget (Rs): 2,00,00,000
-
Estimated timeline:
N/A
- Faculty Members: HOD (Lead Role) and Lab Faculty Incharge
Renovation and Naming right of Work Shop, boler house, unit operation and Heat Transfer Lab
- Proposed budget (Rs): 8,00,00,000
-
Estimated timeline:
1 Year
- Faculty Members: HOD (Lead Role) and Lab Faculty Incharge
Renovation and Naming right of Chemical Technology Laboratory
- Proposed budget (Rs): 1,50,00,000
-
Estimated timeline:
1 Year
- Faculty Members: HOD (Lead Role) and Lab Faculty Incharge
Renovation and Naming right of Chemical and Instrumental Analysis Laboratory
- Proposed budget (Rs): 1,50,00,000
-
Estimated timeline:
1 Year
- Faculty Members: HOD (Lead Role) and Lab Faculty Incharge
Renovation, upgradation of Sophisticated Instruments Laboratory and Naming right
- Proposed budget (Rs): 10,00,00,000
-
Estimated timeline:
1 Year
- Faculty Members: HOD (Lead Role) and Lab Faculty Incharge
Renovation of Class G1, G2, G3, F1 and F2
- Proposed budget (Rs): 17,00,000
-
Estimated timeline:
1 Year
- Faculty Members: Civil Engineering Dept (Lead), HOD (Lead Role)
Upgradation of Seminar Room
- Proposed budget (Rs): 20,00,000
-
Estimated timeline:
1 Year
- Faculty Members: Civil Engineering Dept (Lead), HOD (Lead Role) and Faculty In-charge Seminar Room
Upgradation of Room to a Conference Room
- Proposed budget (Rs): 20,00,000
-
Estimated timeline:
1 Year
- Faculty Members: Civil Engineering Dept (Lead), HOD (Lead Role) and Faculty In-charge concerned Unit
Upgradation of NDH Hallankit.civ@iitbhu.ac.in
- Proposed budget (Rs): 30,00,000
-
Estimated timeline:
1 Year
- Faculty Members: Civil Engineering Dept (Lead), HOD (Lead Role) and Faculty In-charge concerned Unit
Partial Support for Student Internships/Training
- Proposed budget (Rs): 20,00,000
-
Estimated timeline:
3 Years
- Faculty Members: Civil Engineering Dept (Lead), HOD (Lead Role)
Renovation of Laboratory ( Under 7 Specializations) with Naming Rights
- Proposed budget (Rs): 10,50,00,000
-
Estimated timeline:
2 Years
- Faculty Members: Civil Engineering Dept (Lead), HOD (Lead Role) and Faculty Incharge of the Lab